TL;DR — Quick rules you can apply today

  1. Calculate load current: Iload=PV×PFI_\text{load} = \dfrac{P}{V \times \text{PF}} (single-phase).
  2. Continuous loads: choose a device ≥ 125% of design current (or per your local code).
  3. Motors/transformers/LED drivers: expect inrush; start with Curve C (or D for very high inrush).
  4. Choose leakage type: for smart RCBOs, default to Type A unless loads are strictly linear.
  5. Breaking capacity: device Icn/Icu ≥ prospective short-circuit current at the board (e.g., 6 kA).
  6. Metal enclosures: plan for Wi-Fi/Zigbee signal (antenna or hub placement).
  7. Document: record settings (over-current limit, leakage setpoint, auto-reclose policy).

Step-by-step sizing (copy/paste checklist)

Step 1 — Determine the load and duty

  • Resistive (heaters, incandescent): steady current, low inrush

  • Mixed/electronic (LED drivers, IT gear): moderate inrush

  • Inductive (motors, pumps, compressors): high inrush

Step 2 — Calculate design current

  • Single-phase: I=PV×PFI = \dfrac{P}{V \times \text{PF}}

  • Three-phase (line current): I=P3V×PFI = \dfrac{P}{\sqrt{3}\,V \times \text{PF}}

Step 3 — Apply the “continuous load” factor

  • For loads running ≥ 3 hours, many codes require sizing at 125% of continuous load current.

  • Round up to a standard rating (e.g., 10A, 16A, 20A, 25A, 32A, 40A, 50/63A).

Step 4 — Pick the trip curve

Trip curve Inrush tolerance Typical use Tip
B Low Resistive, small electronics Most sensitive to inrush—good for lighting/outlets
C Medium General purpose, small motors, mixed loads Default for many smart breakers
D High Heavy motors, transformers, welders Use when measured/expected inrush is high

Step 5 — Confirm breaking capacity

  • Ensure Icn/Icu (e.g., 6 kA) site short-circuit level.

  • Coordinate with upstream protection for selectivity (the downstream trips first where practical).

Step 6 — Choose RCBO type (if leakage protection is required)

  • Type A detects AC + pulsating DC → best for modern loads.

  • Type AC detects pure AC → only for strictly linear legacy loads.

Step 7 — Final checks (smart features)

  • Over-current thresholds (if the device allows fine tuning)

  • Leakage setpoint (commonly 30 mA for final circuits)

  • Auto-reclosing policy (limited retries, cool-down, lockout on repeated RCD trips)

  • Antenna/hub location for stable connectivity

Common loads: fast sizing table (230 V single-phase examples)

Load Power / Notes Est. PF Design current Suggested device (rating & curve)
Space heater 2.0 kW resistive 0.98 ~8.9 A B16 smart breaker/RCBO (continuous margin)
Water heater 3.0 kW resistive 0.98 ~13.3 A B20 or C20 (continuous duty)
Air conditioner (small) 1.5 kW compressor 0.85 ~7.7 A (run) C16 (motor inrush)
Well pump 1.1 kW motor 0.80 ~6.0 A (run) C16 (or D16 if high inrush)
LED lighting circuit 400 W mixed drivers 0.90 ~1.9 A B10 (sensitive but OK)
IT rack (SMPS) 1.2 kW electronics 0.90 ~5.8 A C10/16 (consider C for inrush)

1–20A vs 1–63A — when to use which range

Range When it fits Typical circuits Notes
1–20A Light duty & branch circuits Lighting, IT loads, small pumps/AC Great for fine granularity and selectivity
1–63A Heavier feeds & mixed sub-circuits Water heaters, EV accessories*, shop circuits Allows growth; confirm cable size and fault level
  • For EV charging equipment and similar, always follow specific local code & manufacturer instructions.

FAQs

Q1: Should I increase the amp rating to stop nuisance trips?
Not first. Match the curve (C/D for inrush) and fix wiring/grouping before increasing amperage.

Q2: Do I need Type A RCBOs for smart circuits?
Usually yes, because modern loads create pulsating DC leakage. Use Type A unless your circuit is purely linear.

Q3: Is 6 kA breaking capacity enough?
Only if your prospective short-circuit current at the board is ≤ 6 kA. Confirm with your designer/installer.

Q4: How do I size for continuous duty?
Many codes require sizing at 125% of continuous current. Check your local standard and round up to the next standard rating.

Q5: Wi-Fi keeps dropping in a metal enclosure—what to do?
Use Zigbee mesh with the hub outside the box, or a 4G variant for sites without reliable Wi-Fi.

Prev post
Next post

Leave a comment

Please note, comments need to be approved before they are published.

Thanks for subscribing!

This email has been registered!

Shop the look

Choose options

Edit option
Back In Stock Notification
Compare
Product SKU Description Collection Availability Product type Other details
this is just a warning
Login
Shopping cart
0 items